Our professionals have the experience of having worked on the following projects
Structural Analysis and Design
Brand owner: Different clients
Developer and operator: Independent consulting services
Queretaro, Mexico
30+ Private Luxury and Mid-level Residences in Querétaro City
1991 - 2020
Role: Structural Analysis and Design
Phase: Pre-construction
Villa Magna Condo
Brand owner: Alexandra Construction Company
Developer and operator: Alexandra Construction Company / Hotel Camino Real
Santa Cruz, Bolivia
Apart-hotel and Apartments
1998 - 1999
Role: Construction management
Phase: Pre-construction & Construction
“Viscarra” Apartment Building
Brand owner: Alberto Viscarra
Developer and operator: Alberto Viscarra
La Paz, Bolivia
Apartments
2003
Role: Structural Analysis and Design
Phase: Pre-construction
Mayan Palace Tower
Brand owner:
Grupo Vidanta
Developer and operator:
Grupo Vidanta
Mazatlán, Sinaloa, Mexico
Resort Hotel
2007 - 2008
Role: Construction direction
Phase: Construction & Commissioning
Mayan Lakes - Phase 2
Brand owner:
Grupo Vidanta
Developer and operator:
Grupo Vidanta
Acapulco, Gro., Mexico
Apart-hotel and Apartments
2007 - 2008
Role: Construction direction
Phase: Construction
Integral Construction and Maintenance of Offshore Oil Rigs
Brand owner: PEMEX (Petróleos Mexicanos)
Developer: PEMEX (Petróleos Mexicanos)
Campeche, Gulf of Mexico
Oil rigs and process centers: BACAB-A, AKAL-C, AKAL-C3, BALAM-TA, AKAL-P, AKAL-C6, AKAL-C HABITACIONAL 1, AKAL-C4, AKAL-I, NOHOCH-A (CENTRO DE PROCESO), AKAL-C5, IXTOC-A,
HA-ZAAP-C, E-KU-A1
2009
Role: Project & construction management
Phase: Pre-construction & Construction
"Coyote" Yeast Industrial Plant
Brand: Fleischmann's
Developer: AB MAuri
Boca del Rio - Córdoba, Cotaxtla, Ver.
2011 - 2012
Role: Technical Audit of the Engineering Project, Analysis and Structural Design, External Construction Supervision - ENERIN (ENERGIA INTEGRAL, S.A. DE C.V.)
.
Phase: Construction
Azul Beach Resort Negril
Brand owner:
Karisma Hotels & Resorts
Developer and operator:
Karisma Hotels & Resorts
Negril, Jamaica
Five-star Resort
2015 - 2017
Role: Engineering projects direction
Phase: Pre-construction, Construction & Commissioning
Margaritaville Island Reserve Cap Cana
Brand owner:
Margaritaville Island Reserve
Developer and operator:
Karisma Hotels & Resorts
Punta Cana, Dominican Republic
Resort Hotel
2018 - 2020
Role: Engineering projects direction
Phase: Pre-construction & Construction (foundations)
Aditivos Mexicanos S.A De C.V. - Chevron de Mexico
Brand owner: Chevron México
Developer and operator: Aditivos Mexicanos S.A. De C.V.
San Juan del Río, Qro., Mexico
Two Warehouses, Laboratory and Offices Buildings, Tanks and Equipment Foundations and Process Pipelines Systems
1991 - 1992
Role: Construction management
Phase: Construction, Phase I
Don Carlos Condo
Brand owner: PINCAD Estudio de Ingeniería y Arquitectura S.A.
Developer and operator: PINCAD Estudio de Ingeniería y Arquitectura S.A.
Santa Cruz, Bolivia
Luxury Apartments
1999 - 2000
Role: Structural Analysis and Design, and Project direction
Phase: Pre-construction (structural design and planning) & Construction.
Mario Mercado Avenue
Brand owner: Gobierno Municipal de La Paz
Developer and operator: ICA (Bolivia) (Ingenieros Civiles Asociados S.A.)
La Paz, Bolivia
Infrastructure and paving works
2003 - 2004
Role: Construction management
Phase: Pre-construction & Construction
Grand Luxxe
Brand owner:
Grupo Vidanta
Developer and operator:
Grupo Vidanta
Nuevo Vallarta, Nayarit, Mex.
Resort Hotel
2007 - 2008
Role: Construction direction
Phase: Pre-construction
The Grand Mayan
(Torres Copanes)
Brand owner:
Grupo Vidanta
Developer and operator:
Grupo Vidanta
Nuevo Vallarta, Nayarit, Mex.
Resort Hotel
2007 - 2008
Role: Construction direction
Phase: Construction & commissioning
Túnel Emisor Oriente
Developer: CONAGUA (Comisión Nacional del Agua)
Mexico City, Mexico
Eastern Wastewater Discharge Tunnel
2010 - 2011
Role: Project direction for
Specialized Technological Assistance Services for Excavation Systems used for the construction of the "Túnel Emisor Oriente" - Pöyry (México) S.A. de C.V.
.
Phase: Construction
Cinépolis Corporation - Cost Management for construction of movie theaters
Brand owner: Organización Ramírez S.A.
Developer: Cinépolis
Cost analysis for business case, development of construction budgets, development of cost parameters for different types of theaters
Aproximately 50 projects in different phases.
2013 - 2014
Role: Cost Management
Phase: Pre-construction & Construction
Nickelodeon Hotels & Resorts Riviera Maya
Brand owner:
Nickelodeon Hotels & Resorts
Developer and operator:
Karisma Hotels & Resorts
Quintana Roo, Mexico
Five-star Resort and Aqua Nick water park
2017 - 2020
Role: Engineering projects direction
Phase: Pre-construction & Construction
Sugarcane Bay multi-resort development by Karisma Hotels & Resorts
Brand owner:
Karisma Hotels & Resorts
Developer and operator:
Karisma Hotels & Resorts
Llandovery, Saint Ann, Jamaica
Macro development for 10 Hotels, Golf, Casino and Amenities
2018 - 2020
Role: Engineering projects direction
Phase: Pre-construction (preliminary infrastructure and urban design), Design & Planning
Hotel Camino Real
Brand owner:
Hotel Camino Real
Developer and operator:
Hotel Camino Real
Santa Cruz, Bolivia
5-Star Hotel
1998 - 1999
Role: Construction management
Phase: Pre-construction & Construction
Ministry of Housing and Basic Services - Cost Management for housing development programs
Brand owner and Developer: Ministry of Housing and Basic Services, La Paz, Bolivia
La Paz, Bolivia
Manual of Construction Technologies for Low Cost Houses
2001 - 2002
Role: Engineering and Cost Management
.
Phase: Planning
Turks and Caicos Sporting Club - Phase 1
Developer and operator:
JACA TCI Ltd
Big Ambergris Cay, Turks and Caicos Islands
Top Exclusive Club
2006
.
Role: Project management
Phase: Construction
The Grand Mayan
Brand owner:
Grupo Vidanta
Developer and operator:
Grupo Vidanta
Puerto Peñasco, Son., Mex.
Resort Hotel
2007 - 2008
Role: Construction direction
Phase: Pre-construction & Construction (Foundations)
The Grand Bliss
Brand owner:
Grupo Vidanta
Developer and operator:
Grupo Vidanta
Nuevo Vallarta, Nayarit, Mex.
Resort Hotel
2007 - 2008
Role: Construction direction
Phase: Pre-construction (conceptual preliminary design)
Structural Analysis and Design
Brand owner: WOK Restaurant
Developer and operator: Gabrig, S.A. de C.V.
Queretaro, Mexico
Commercial Building
2011
Role: Structural Analysis and Design
Phase: Pre-construction
DFI Headquarters
Brand owner: DFI
Developer and operator: DFI
Edmonton, AB, Canada
Design, supply and installation of steel piling products.
Construction of Offices, Pipemill and Workshop Buildings and Switchyards
2014 - 2015
Role: Civil Engineering Management
Phase: Pre-construction & Construction
Margaritaville Island Reserve Riviera Cancún
Brand owner:
Margaritaville Island Reserve
Developer and operator:
Karisma Hotels & Resorts
Quintana Roo, Mexico
Resort Hotel
2019 - 2020
Role: Engineering projects direction
Phase: Refurbishment of existing hotel. Pre-construction & Construction
Industrial Dining Room - Corporativo Banco Santander Querétaro
Brand owner: Grupo Financiero Santander México, S.A.B. de C.V.
Developer: Dinámica de Proyecto Supervisión y Construcción, S.A. de C.V.
Querétaro, Mexico
2005
Role: Project direction
Phase: Construction
.
Ministry of Housing and Basic Services - Engineering Consulting for housing development programs
Brand owner and Developer: Ministry of Housing and Basic Services, La Paz, Bolivia
La Paz, Bolivia
Cost Analysis Database for Houses Construction in Bolivia
2001 - 2002
Role: Engineering and
Cost Management
Phase: Planning
The Grand Mayan
Brand owner:
Grupo Vidanta
Developer and operator:
Grupo Vidanta
Los Cabos, B.C.S., Mexico
Resort Hotel
2007 - 2008
Role: Construction direction
Phase: Construction & Commissioning
The Grand Mayan
Brand owner:
Grupo Vidanta
Developer and operator:
Grupo Vidanta
Riviera Maya, Q. Roo, Mex.
Resort Hotel
2007 - 2008
Role: Construction direction
Phase: Construction
Bidgestone-Firestone Plant - Cuernavaca
Brand owner: Bridgestone de México, S.A. de C.V.
Developer: Walbridge de México, S.A. de C.V.
Cuernavaca, Mor., Mexico
Bridgestone Firestone Industrial Plant - Phase II, III
2008
Role: Project management
Phase: Construction
PASST Project (Programa de Autogestión en Seguridad y Salud en el Trabajo)
Developer: PEMEX (Petróleos Mexicanos)
Campeche, Gulf of Mexico
Platforms for oil production and processes
2011 - 2012
Role: External consulting for technological diagnosis, mechanical integrity, and action plans for industrial safety certifications - ENERIN (Energia Integral S.A. de C.V.)
.
Phase: Planning
Nickelodeon - Sensatori Punta Cana Resort
Brand owner:
Nickelodeon Hotels & Resorts
Developer and operator:
Karisma Hotels & Resorts
Uvero Alto, Punta Cana, D.R.
Nickelodeon Hotels & Resorts Punta Cana
2015 - 2016
Role: Engineering projects direction
Phase: Pre-construction, Construction & Commissioning
Margaritaville Island Reserve Riviera Maya
Brand owner:
Margaritaville Island Reserve
Developer and operator:
Karisma Hotels & Resorts
Quintana Roo, Mexico
Resort Hotel
2017 - 2020
Role: Engineering projects direction
Phase: Pre-construction & Construction